Conferencia Asfalto Espumado. Public. · Hosted by IFUCE Cal Química Mexicana. Interested. clock. Wednesday, April 29, at PM UTC More than a. ¿Qué es el asfalto espumado? Los asfaltos espumados son una técnica que se ha utilizado con éxito en distintos países en la producción de mezclas asfálticas. Thenoux G., Gonzalez A., and Jamet A., “Aspectos constructivos del primer proyecto de reciclado in situ utilizando asfalto espumado,” Revista Ingeniería de .

Author: Fenrihn Tahn
Country: Antigua & Barbuda
Language: English (Spanish)
Genre: Music
Published (Last): 17 June 2011
Pages: 192
PDF File Size: 4.88 Mb
ePub File Size: 12.22 Mb
ISBN: 705-7-95380-664-7
Downloads: 78117
Price: Free* [*Free Regsitration Required]
Uploader: Volrajas

E l using these experimental technologies must be done in a progressive manner, and supported on objective, technically sound and consistent, which in one way or another, justify its use.

Finally, this gives rise to future work in calibration of other aafalto models. The VSD was then used to build contour plots of each pavement section.

The placement of the surface layer is also quite advanced and it is expected that the route is completely renovated in a few months. With a constant water flow, an additional 60 kN load cycles were applied.

Asfalto Espumado

The pavement test results presented indicate that stabilisation using FB and cement improved the performance of the espumaco. The averaged rutting measurements for each pavement section are presented in Figure 5.

For the model fitting the root mean square RMS was used: When you click OK to continue with navigation and thus confirm that you have read the information and accept the activation of cookies.

The top mm of the subgrade was clay, asfwlto in lifts ofand mm, and compacted using a roller available at CAPTIF.

  FEDEX US AIRBILL PDF

Who would have thought it stabilize soils with continuous and mobile equipment was to be imposed so quickly? The model fitting of the two-parameter model is shown in Table 1 bottom.

Where n is the number of data points, d c is the calculated rutting depth and d mi is the measured average rutting. In addition, the figure shows the better performance of section B28C10 compared to B00C As anecdotario plus all innovations in this work, conducted jointly develop gravillados hot applied in July, during the winter closed asfslto with a very good technical and result only applied at low temperatures in our country Bulletin July A total number of approximately 5.

In Costa Rica the rainy season lasts approximately 8 months. We can proudly say that the Uruguayan road has become unrivaled in the last five years.

Asfalto espumado by Lucio Borelli on Prezi

Therefore, the H40 particle size distribution was adjusted using an AP5 crusher dust to bring the aggregate into the recommended grading zone.

Results from the full-scale study lead to the following findings: Users Manual, 2nd ed. Average rutting By the end of the test little difference was found in the rutting measurements of sections stabilized with foam bitumen and cement sections B12C10, B14C10 and B28C The results showed that 2.

Figure 7 shows the contour plot for sections B28C10 and B00C10 afterload cycles. Transverse surface profiles at each of the 58 pavement stations were taken at several stages of the project. Nevertheless, the water penetrated into the subgrade causing swelling of this layer and modifying the final levels of the pavement structure.

  BEAGLEBOARD XM MANUAL PDF

The CVC recently started with recycling Route using recycling technology in situ foamed bitumen. In this aspect, from the Bitafal Group to continue innovating bet in real technical solutions for the durability of rural roads.

Conferencia Asfalto Espumado

The investigation consisted of a laboratory study, in which different types of tests were conducted, and a full-scale test, in which accelerated load was applied to FB pavements. Check your personal services cookies here. Necesita tener JavaScript habilitado para poder verlo.

This paper presents a study on the performance of foamed bitumen pavements tested in the Canterbury Accelerated Pavement Testing indoor Facility CAPTiFfor full scale testing of pavements. Surface layers All sections were sealed with a single coat chipseal. The first model described the stable and unstable rutting of the pavement sections while second model only considered the stable phase in where a steady increase in rutting with the number of cycles is observed.

Furthermore stoves have been incorporated and accessories press multifunction account Center to carry out the relevant tests. The loading speed applied during the test corresponds to After the application of an additional 42, load cycles under wet conditions, Section B12C10 started to show extensive cracking and further surface deformation in comparison with the other two sections, with evidence of some loss of fines Figure 6.